| |
Following our success with the Research Facility Wet Laboratory at the John Innes Centre, we were fortunate to be asked to design and install a complete bespoke Research Laboratory for the Norwich Research Park. Working directly with the NRP we consulted and designed a laboratory to suit their customers’ requirements, offering them material, construction and finish options of their choice.
The research laboratory was constructed for rigorous use. Trespa TopLab - a 16mm solid core material with a high resistance to chemicals - was used for the worktops, upstands, reagent shelving and wall shelves and the under frame was a 50mm x 25mm ‘A’ frame box section, offering superior strength. A hand wash facility was created and a double drainer sink in 316 grade acid resistant stainless steel was supplied, as well as data and power throughout. Storage consisted of double door mobile under desk units and a new fully equipped fume cupboard. |